water treatment plant

 

Greater kandy drinking water treatment plant

 Drawbacks observed in plant

water is pumped against gravity with electricity causing high electricity cost

water is not aerated assuming it gets aerated within the river.

water source is arround a densly populated area

water treatment plant supply water to a large area which may result water shortage to a greater area in case of breakdown.

manual cleaning of grit filters is not effective if huge amount of inflow

pumping station is located at a low level which may obstruct incase of a flood

 

 Steps of water purification in water treatment plant.

Coarse screening:

to prevent leaves, sticks,
and other large pieces of
debris from entering to the
grit chamber (clear opening
50mm)

Manual cleaning


Fine screening:

purpose is to collect smaller
material that has passed
through the coarse screen
(clear opening 10mm )

Mechanically cleaned

Grit removal

The design objective of the grit
chamber is to remove sand or silt
particles greater than 0.1 mm in
diameter.

Sand and silt is very abrasive and will
result in excessive wear to mechanical
equipment

Full Capacity: 115,000 /day

2 grit chambers

Dimensions of grit chamber: 6m width x
33.5m length 3.1m depth x 2 basins

Detention time 15min

Destribution chamber

Type : Distribution chamber with hydraulic rapid mixing by weir.
Number: 1 unit with a capacity of 115,000 m³/day

G value for rapid mixing : 300 -330 s-1 (>300 s-1 )

Applied chemicals : Chlorination -Liquid chlorine (99.9%)

pH control - Lime (10% solution)

Coagulant - PAC (10% solution)

FLOCCULATION

Type : vertical flow baffled channels
Numbers : 4 trains

Capacity : 100,000 m3/day

Detention time : 30 min

Coagulation purpose is to increase the settling velocity. When size
of aggregates increases, their settling velocity automatically
increases. Coagulation is completed in two steps.

Particle de-stabilization.(through chemical reaction
between coagulant and colloids)

Particle transportation (Flocculation).

Sedimentation

Type Rectangular plug flow
Number: 4 train with hydraulic

sludge removal pipe

Capacity :100,000m3/day

Surface loading: 38.5mm/min

Dimensions : 11m width x 41 m
length x 4m depth

Filtration

Type : Rapid Sand filter
Filtering rate:
200m3/m2/day

Filter media : Silica
sand, 1200mm thickness

ES=1.0 -1.2,mm, UC<1.5

Number of filters : 8

Dimension per unit:
7.2mx9.6m (69.1m²/unit )

Capacity : 100,000cum/day

Backwash: 48 hrs interval

Disinfection/ Chlorination

Gas chlorine is used (900kg
cylinders)

Pre chlorination: 50 kg/day

Post chlorination:70 kg/day

Free Residual Chlorine (OCl ) is very effective in killing
Bacteria

Min RCL concentration at treatment plant : 1 PPM

Min RCL concentration at distribution end : 0.2 PP
    